Monday, April 29, 2013

Lumpy's chrome showed up Friday......

......so we wasted no time assembling his springer, and getting the bike up on its own two wheels.
The wiring is finished, and all systems are GO! Kinda like a blivit. What's a blivit? 10 pounds of shit, in an 8 pound bag....it all fit, though, with enough space left to do his electric speedometer hookup.
Now, if I can figure out the pesky hydraulic clutch setup, we're all finished. I suspect a hung-up puck in the cover. Before I installed the cover, I took the puck out, lubed the bore, puck, and O rings with DOT 5, to avoid this. We'll see on Tuesday, I'm swapping trans and rear sprockets for Kyle tomorrow.

No comments:

Post a Comment