......so we wasted no time assembling his springer, and getting the bike up on its own two wheels.
The wiring is finished, and all systems are GO! Kinda like a blivit. What's a blivit? 10 pounds of shit, in an 8 pound bag....it all fit, though, with enough space left to do his electric speedometer hookup.
Now, if I can figure out the pesky hydraulic clutch setup, we're all finished. I suspect a hung-up puck in the cover. Before I installed the cover, I took the puck out, lubed the bore, puck, and O rings with DOT 5, to avoid this. We'll see on Tuesday, I'm swapping trans and rear sprockets for Kyle tomorrow.